Before approving a custom forklift mast profile for repeat orders, confirm that the sample matches the released drawing, that the inspection report identifies the sample, and that the part has been reviewed in the intended assembly. Approving the cross-section alone does not confirm fit or authorize a change to the drawing.
1. Identify the sample and drawing revision
Record the part number, drawing revision, sample identifier and delivery condition. Make clear whether the sample represents the as-rolled section, a cut blank or the finished component. If features are machined after rolling, specify which dimensions are checked at each stage.
2. Review the inspection report against the drawing
Ask the supplier to identify the measured part, the drawing revision and the measurement locations. Compare actual readings with the drawing limits for the features your engineering team has designated as critical. If straightness or twist is controlled, agree on the measurement length and method before comparing readings.
3. Confirm fit at the interfaces that matter
Have the responsible engineering team review the sample with the intended mating parts or approved fixture. Record where any interference, clearance or alignment issue occurs. A dimensional report and an assembly review answer different questions; neither substitutes for the other.
4. Record approval and what requires a new sample
Document whether the part is approved, approved with an expressly documented exception, or returned for revision. Agree in writing which changes require notification or another sample, such as a revised drawing, material change or a change in the agreed production route. Keep the approved sample reference and inspection record with the purchase specification.
Request a sample review
See the C- and J-type forklift mast profiles and the guide to mast rail dimensions and inspection. To discuss a sample, send the released drawing, inspection requirements and expected volumes.